Skip links

Water Treatment Factory-Grenoble

Architecture France

Grenoble Water Treatment factory

Grenoble (38) PACA

Construction of a metal structure building and a footbridge connecting the extension to an existing building. The intervention includes bringing the entire site up to standard and securing it. The extension program includes two large offices, an equipped meeting room and an automation room.

The extension project takes the size of the existing station. It frees itself from the ground and rests on a set of steel posts whose distribution of forces minimizes the impact of the building on the water table less than 2 m from the natural ground. Its light structure provides modularity to offices and broad framing of the external environment. Low energy consumption building (50kw/m² per year)

Client

Ville de Grenoble

Type

Completed

Design team

DE-SO mandataire / ARCHI ECO architectes associés / BETREC bet tce / THERMIBEL bet fluides

Size

180 m² GFA

This website uses cookies to improve your web experience.